The Camperdown Apartments Tower Crane was dismantled

A very large crane was placed on Falls St that was closed for the operation on April 22. It reached over the new building to the west side and took the tower crane down piece by piece. At 10:00 the horizontal pieces were all removed and when I came by at 12:30 the final tower piece was being unloaded by the crew.

Photo by Frank Mansbach

One Response to “The Camperdown Apartments Tower Crane was dismantled”

Leave a Reply

Basic HTML is allowed. Your email address will not be published. Subscribe to this comment feed via RSS